PLC Control Mine Ventilation Doors
video

PLC Control Mine Ventilation Doors

The PLC control mine ventilation doors is an intelligent safety product specially developed by Shandong Rongliyuan for underground scenarios in coal mines and metal mines. It integrates precise ventilation control, regional isolation, and explosion-proof protection. With PLC intelligent control as the core, it achieves dual upgrades in automation operation and safety protection, and is suitable for complex underground working environments.
Send Inquiry
Product Introduction

Cross-mineral adaptation, intelligent response

 

IMG20250826104307

plc control mine ventilation door: In response to the explosion risks of methane and coal dust in coal mines, the PLC explosion-proof adaptation and signal anti-interference design have been strengthened; it is adapted to the high-humidity, dusty and variable working conditions in underground metal mines, and the anti-corrosion and intelligent monitoring functions have been optimized. It can operate stably within the temperature range of -20℃ to 40℃, humidity of ≤95%, and an altitude of ≤2000m. It can be installed in the intake and return airways, the connection alleys of mining areas, and the blasting area passages, achieving intelligent control of air flow and precise isolation of dangerous areas.

The door panel is made of 12mm high-strength alloy steel, with a surface coated with anti-corrosion layer; the door frame is an integrated steel welded structure with built-in reinforcing ribs; the sealing system uses silicone + pneumatic auxiliary sealing, with a leakage rate of ≤ 1.5%; the core control unit is a mine-used intrinsically safe PLC, supporting multiple signal access and logical programming; the opening mechanism is paired with a flameproof motor, ensuring smooth and precise opening and closing; the manual emergency mechanism is independently designed, with an opening force of ≤ 130N; the core components also have explosion-proof and intelligent features.

DSC02807
66de26f9f4beea7709817586c1c0de8
Safety compliance, intelligent protection

Comply strictly with the explosion-proof standards of GB 3836.1-2010, GB 3836.2-2010, and GB 3836.4-2010, as well as the mining specifications of MT/T209-1990. The explosion-proof mark is Exd[ib]I Mb, with a fire resistance limit of 3 hours. The pressure resistance level is 0.42 MPa, and the anti-shock design can withstand a peak impact of 600 m/s²; the emergency opening function supports manual quick opening and closing when power and pressure are cut off, and the anti-collision sensor uses infrared sensing. When encountering people or vehicles, it will automatically rebound and alarm.

FAQ

 

 

8649e8642360c081ea6652ed5a0978e

01.Does PLC control require professional operation?

With a Chinese operation interface, parameter settings are simple and easy to understand. Daily operations do not require professional skills. Complex debugging can be assisted remotely.

02.Will poor underground signal affect control accuracy?

PLC uses anti-interference signal transmission modules and is equipped with a dedicated mining communication protocol. The signal transmission is stable and is not affected by the complex underground environment.

 

 

User Review
modular-1

A technical supervisor of a coal mine

"The PLC control has high precision, can automatically adjust the ventilation volume, has a convenient remote monitoring function for management, self-diagnosis of faults reduces operation and maintenance costs, and has no faults for two years of use."

9a3ff6b3c28151e933740a27b36c930

A equipment section chief of a metal mine

"The customized size fits the roadway perfectly, has excellent anti-corrosion performance, the PLC linkage anti-collision function is practical, is easy to install, and greatly improves the safety of underground operations."

modular-1
Opening the Box and Inspection

After opening the box, it is necessary to check if the contents match the packing list. The packaging box should contain the following documents:
1. One copy of the product certificate of conformity;
2. One copy of the user manual;
3. One copy of the packing list.

 

Hot Tags: PLC Control Mine Ventilation Doors, China PLC Control Mine Ventilation Doors manufacturers, suppliers, factory, Mine Door, Mining Balanced Pressure Free Vent Door, Vent Mine Door for Mining, Mine approved Pressure Free Air Door, Air Door for Mining, Air Door Electric Control Device

Send Inquiry

whatsapp

Phone

E-mail

Inquiry